Many new buildings use a termicide treated coating of soil surrounding and under the building. This forms an integrated barrier, along with the physical methods mentioned above. The termicide is placed on the soil under the slab and around the footings, pipes, conduits and other structures of the house during construction to make a vertical barrier.

Timber used to construct houses, outbuildings, fences and other outdoor structures can be treated with chemicals. These are commonly referred toas treated timbers and ought to be considered in the time of designing or constructing the buildings.

Termite Control Technician Job Description - An Overview


To successfully incorporate termite barriers into existing buildings, tactical drilling through concrete slabs, porches, flooring and wall footings may be needed, in addition to under ground treatment.

Building and Energy recommends only licensed pest controllers carry out this work. Chemical baits Strategically put bait stations can be employed to lure termites into a food supply, for example dry wood or paper deny. About 30 bait stations are needed for a normal house and they need to be inspected often to evaluate termite activity. .

Once the termites are attracted to the bait station, a specific termicide is added that sticks to the termite.

Termite Control Technician Job Description Can Be Fun For Anyone


To deal with termites in the garden, specialised pest managers drill into timber or the trunk of a tree to insert temperature probes that help to locate the termite nest.  Despite regular inspections of the garden, termites may still enter the house. In the house, first indicator might be a small discolouration of a wall , followed by warping if wood panelling is used to line the wall.

Make care to investigate the dimensions and nature of the problem in addition to the options offered for termite eradication. .

Whichever system you select, it's important to perform regular inspections in particular inspect your house every six months for any apparent signs of infestation. Building and Energy recommends you arrange for an inspection by a licensed pest control operator at least once a year to look for signs of infestation and to undertake any preventative measures. .

Things about Termite Control Technician Job Description


For existing buildings, in which you have found signs of infestation, chemical treatment is usually the only option for destroying the termite nest. This treatment can include re-establishing a chemical and/or physical barrier and regular inspections to detect any ongoing or new termite activity.

Treatment with a termicide directly into tunnels of this nest in which termites are known to be more active can reduce numbers, but it seldom eliminates the helpful site colony entirely unless it's used in conjunction with another method.

Excitement About Termite Control Technician Job Description


When buying an existing house, Consumer Protection recommends including a White Ant Certificate clause in the Offer and Acceptance form. This is intended to make certain the home is free of termites and there is no structural damage from any prior infestation. Another fact sheet about the need for timber pest inspections and reports when buying home can be found in the Department of Commerce by contacting the Consumer Protection Advice Line on 1300 304 054. .

If you are constructing a new home or building or renovating an existing one you need to comply with the termite risk management and barrier requirements of the this page National Construction Code (NCC) and relevant standards. In the majority of situations a building permit will be needed before carrying out building work and the details of the sort of termite barrier should be submitted as part of the building permit application procedure.

The 9-Minute Rule for Termite Control Technician Job DescriptionThe Buzz on Termite Control Technician Job Description

Some Known Facts About Termite Control Technician Job Description.


The NCC requirements aim to reduce the risk of termite damage to main building elements that are mostly the structural elements of a building butdo not include non-structural elements like cabinet work and furniture.

It's a requirement of the NCC a durable notice be permanently fixed to the building in a prominent location, navigate to this website including in a tube or so on. The notice should indicate the type and method of termite risk management and the date that the system was installed, along with the installers or manufacturers recommendations for the extent and frequency of future inspections.

For specific information about termite protection for a proposed new residence, contact a building surveyor, a builder or builder or a licensed pest control professional.

The Buzz on Termite Control Technician Job Description


If you've had building work carried out in the previous six years and the contractor did not provide termite protection as required by the NCC, you can refer the issue to the Building and Energy.

Plumbing leaks, drainage issues and roof flows should be dealt with quickly, as moist conditions bring termites.

Indicators on Termite Control Techniques You Need ToThe Basic Principles Of Termite Control Tenting

4 Simple Techniques For Termite Control Tenting


Garden beds and plants should be kept away from direct contact with walls. Hard paving ought to be substituted.